
Background
Healthy snack company Graze needed additional storage for their over-spill of packaging during peak periods.
As a food handling company, the integrity of the building was a top priority so a standard style ‘tent’ would not suffice. Graze also wanted the ability to remove the building quickly should they need to.
Solution
Smart-Space supplied a 10m x 40m building with 6m walls with twin-layer air insulated roof for condensation protection.
Scott Law, Manufacturing Director commented
“I spoke with a number of companies. The overall commercial proposition and flexible finance options combined with a lead time that suited my needs made Smart-Space the front runner, the initial contacts, response and support sealed the deal as it gave me the confidence and assurance I needed.”
“What we have is a temporary building that can be dismantled quickly but absolutely feels like a purpose built industrial structure including fire exits, powered shutter doors and being fully secured and sealed to ground.“
He added “Smart-Space are Professional. Did exactly what they said would do. Delivered and installed when advised, all costs as expected and great clear communication throughout from first contact to post install.”
