This company was using off-site storage space but finding the cost of movement and management was adding a considerable (hidden amount) to the overall cost, making the entire process very expensive.

Having been on our database for a number of years, Keith Ward called us to quote for additional on-site storage space.
He was using off-site storage space but finding the cost of movement and management was adding a considerable (hidden amount) to the overall cost, making the entire process very expensive.

We were asked to supply a ‘like for like’ estimate for a 15mtr x 12.5mtr 4.5mtr temporary building for him to compare against two other estimates he’d received.
As the goods to be stored are low value items which are not susceptible to temperature fluctuations, we agreed in the interests of cost-saving to supply the temporary building with non-insulated PVC fabric roof and non-insulated 0.7mm steel wall cladding.
However, to improve access and efficiency, he opted for a rapid rise, fast action roller shutter door which is operated by a floor loop sensor to enable access without the need for manual operation.
The temporary building was delivered and installed in three days from start to finish and has provided the additional space to enable Contract Bottling to cancel their off-site storage contract.
"It looks good and will be very useful, hopefully saving £1 per pallet storage."
Have a space in mind?
Send us the details and we’ll talk you through the options.
Tell us about itReal Projects
Smart-Space delivered a tailored building to power hib's manufacturing.
Following a fire, Smart-Space provided rapid, tailored storage for IBMG.
Fast-installed temporary building created vital space for Central Mailing Services.
Arken Pop was facing an upturn in business and urgent demand for extra storage.
As their product range and stock levels increased, BJ Toys required a fast and efficient way to add more storage.
Dedicated valeting bay to support daily dealership operations.
A chemical manufacturer needed a temporary building to protect a key piece of equipment from the elements.
Smart-Space engineered a shortened bay structure to fit perfectly between two existing buildings.
Boost to school sports capacity
After losing a warehouse to fire, the company required a temporary building installed quickly.
Situated in a green belt area, the project required a building that would complement the landscape.
With packaging volumes increasing, Graze required extra on-site storage capacity.