These temporary buildings were supplied for use in oil refinery blast zone. They needed to be both robust and safe. They used a special heavy floor
We supplied a number of temporary buildings with soft-sided walls covers inside a blast zone at the Fawley Refinery in Hampshire.
The temporary buildings were specified for a number of different applications for the administrative staff and maintenance teams to enable them to carry out their work over a nine week period.

We literally built a self-contained village incorporating administrative offices, workshops, permit to work offices and welfare facilities for a team over nearly 1000 people.
Each of the temporary buildings were supplied using our ‘heavy-floor’ system which has a weight load capacity of 500kgs m² and which is designed to act as the base for the buildings to eliminate the need for pinning.
Have a space in mind?
Send us the details and we’ll talk you through the options.
Tell us about itReal Projects
Smart-Space delivered a tailored building to power hib's manufacturing.
Following a fire, Smart-Space provided rapid, tailored storage for IBMG.
Fast-installed temporary building created vital space for Central Mailing Services.
Arken Pop was facing an upturn in business and urgent demand for extra storage.
As their product range and stock levels increased, BJ Toys required a fast and efficient way to add more storage.
Dedicated valeting bay to support daily dealership operations.
A chemical manufacturer needed a temporary building to protect a key piece of equipment from the elements.
To reduce transport and handling costs, this company required extra storage space on site.
Smart-Space engineered a shortened bay structure to fit perfectly between two existing buildings.
Boost to school sports capacity
After losing a warehouse to fire, the company required a temporary building installed quickly.
Situated in a green belt area, the project required a building that would complement the landscape.