Background
Healthy snack company Graze needed additional storage for their over-spill of packaging during peak periods.
As a food handling company, the integrity of the building was a top priority so a standard style ‘tent’ would not suffice. Graze also wanted the ability to remove the building quickly should they need to.
Solution
Smart-Space supplied a 10m x 40m building with 6m walls with twin-layer air insulated roof for condensation protection.
Scott Law, Manufacturing Director commented
“I spoke with a number of companies. The overall commercial proposition and flexible finance options combined with a lead time that suited my needs made Smart-Space the front runner, the initial contacts, response and support sealed the deal as it gave me the confidence and assurance I needed.”
“What we have is a temporary building that can be dismantled quickly but absolutely feels like a purpose built industrial structure including fire exits, powered shutter doors and being fully secured and sealed to ground.“
He added “Smart-Space are Professional. Did exactly what they said would do. Delivered and installed when advised, all costs as expected and great clear communication throughout from first contact to post install.”
Temporary building for storage of packaging
What we have is a temporary building that can be dismantled quickly but absolutely feels like a purpose built industrial structure including fire exits, powered shutter doors and being fully secured and sealed to ground.
Smart-Space are Professional. Did exactly what they said would do. Delivered and installed when advised, all costs as expected and great clear communication throughout from first contact to post install.
Scott Law, Manufacturing Director Graze