Temporary Sports Hall Keeps PE, Exams and Events Running at The Deepings School

Building Type: Temporary building with thermo-insulated roof
Building size: 20m x 35m x 6m

check_circle Location: Lincolnshire
check_circle Sector: Education

Background

When The Deepings School's existing sports hall was condemned, it needed a fast replacement that could be used for PE lessons and after-school clubs as well as exams, assemblies and other school events. 

The school decided to install a temporary building while it considered its longer-term plans. Having previously delivered a hall for Mount Street Academy, another school within the Anthem Schools Trust, Smart-Space was invited to recommend a suitable option. 

The Challenge

The school required a multi-purpose building that could be delivered quickly and provide space for: 

  • PE lessons and sports clubs
  • School examinations and mock exams
  • GCSE and BTEC Sport teaching
  • Assemblies and school events 

The project also needed to be delivered safely within a live school environment while making the best use of the existing site and infrastructure. 

The Solution

Following a site survey, Smart-Space proposed a 20m x 35m four court hall with specialist sports flooring, heating and cooling and a thermo-insulated roof. This created a comfortable environment for sport and helped maintain a consistent temperature during exams.

The team identified a location beside the existing design and technology block which allowed an overhead connection to be fitted. This gave the new hall access to the school’s electrical, IT and telecommunications services, avoiding the need to install separate infrastructure.

A smaller entrance building was added to provide a foyer where pupils and visitors could gather, while the addition of large entrance mats helped protect the sports floor by keeping it clean and dry during wet weather.

Project Delivery

The installation took place while the school remained open, so the site team worked carefully around pupils, staff and the normal school day.

Despite widespread materials shortages at the time, Smart-Space’s UK supply chain helped ensure the necessary components were available and the project stayed on schedule.

The Outcome

The new hall allowed The Deepings School to continue delivering PE, sports qualifications, examinations and extracurricular activities while considering its longer-term options.

Its multi-purpose design makes it easy to change between uses, with space for four badminton courts, a netball court or four basketball training courts, as well as examinations and whole-school events.

Customer Feedback

Lisa Goodchild, Business Manager at The Deepings School, said:

“The installation team were brilliant. The Site Manager ensured that everything was managed perfectly. They were professional, considerate and especially accommodating during the planning process.

“We have been delighted with the building and are incredibly grateful for the service we’ve received.”

Need Temporary Space for Your School?

If you need to replace unavailable facilities or maintain teaching during building work, call Smart-Space on 01827 330000 or complete the enquiry form to discuss your requirements.

Contact us

Have a space in mind?

Send us the details and we’ll talk you through the options.

Tell us about it

Real Projects

Related projects

See all projects
hib

On-site space that scaled efficiently.

View project arrow_forward
Independent Builders Merchants Group

Restoring Operations: Emergency building on-site in 4 days

View project arrow_forward
Central Mailing Services

Tailored space with no operational impact.

View project arrow_forward
Arken Pop - tparc

Rapid Warehouse Space for a Growing Business

View project arrow_forward
B J Toys 20*20 - tpbj

Temporary Storage Solutions to Support Business Growth

View project arrow_forward
Caffyns Ford Valeting Bay - tpcaf

Extra Valeting Capacity When It Was Needed

View project arrow_forward
Chemical Processing Building

Protecting a Critical Manufacturing Process

View project arrow_forward
Contract Bottling - tpcb

Bringing Storage Back On-Site

View project arrow_forward
Custom Temporary Bridge - Euro Car Parts - tpeur

Making the Most of Every Available Space

View project arrow_forward
Emergency Buildings - tpem

A Rapid Response to a Warehouse Fire

View project arrow_forward
Environmentally Friendly Building - tpgb

Extra Space Without Impacting the Environment

View project arrow_forward
Graze Snacks gra005-1

A Temporary Building for a Fast Growing Snack Brand

View project arrow_forward