Smart-Space Instant Buildings
Additional storage space for Surgery Express Ltd

Additional storage space for Surgery Express Ltd

Their current building were at full capacity. They needed additional storage space. We provided an Interim Building solution saving them thousands in heating and cooling cost over the expected three year life of the facility

check_circle 40mm insulated roof and walls
check_circle No ground preparation costs

Background

We were approached by Surgery Express Ltd as they had completely run out of storage space at their premises in Chesterfield.

They originally asked for a quote for a temporary building, which they wanted to use to compare to other quotes they’d had.

But when we discussed their requirements and established

a) they would need the building for a minimum of three years and
b) the sensitive nature of their products,

we advised them to choose one of our re-locatable ‘Interim’ buildings instead.

Solution

On that basis, we supplied a brand new 7.5mtr x 25mtr x 5mtr ‘Interim’ building complete with 40mm insulated roof panels and 40mm insulated wall cladding.

Installed onto existing ground with no additional costs for ground preparation

The customer is absolutely thrilled with the outcome because not only do they now have a temporary building which resembles a ‘building’ as opposed to an industrial marquee, they will save thousands in heating and cooling costs over the three year period, as this ‘Interim’ building has far superior levels of insulation.

What’s more, the solid gable end panels not only improves the aesthetics of the building, it also adds to the overall rigidity of the building, as well as providing an in-built anti-vermin solution, which is vital to the client with the goods which are being stored inside.

starstarstarstarstar
"The whole job went well and I would recommend this team."
Mike Cuckson, Operations Manager
Surgery Express Ltd
Surgery Express Ltd

Have a space in mind?

Send us the details and we’ll talk you through the options.

Tell us about it

Real Projects

Related projects

See all projects
EU Weatherfords - ibwf

Interim building supports business growth

View project arrow_forward
F G Barnes Showroom - ibfgb001

Rapid showroom solution for FG Barnes

View project arrow_forward
Flightline Support - ibfli002-1

Flightline interim storage unlocks space

View project arrow_forward
Marshall Motor Group - ibmar010-1

Bespoke interim showroom for Marshall Motors

View project arrow_forward
Sherburn School Sports Facility - tpsher001-1

Temporary sports hall at Sherburn High School

View project arrow_forward
Telford Fire Station - tpmcp001-1

Temporary fire station during rebuild

View project arrow_forward
Aquila Trucks - ibaq

Bespoke workshop expansion for Aquila

View project arrow_forward
RNLI

RNLI lifeguard station installed

View project arrow_forward
Salts Healthcare -stsalt

Production bottleneck eased with expansion

View project arrow_forward