Smart-Space supplies additional temporary warehouse to a Suffolk Transport company to meet the needs of a growing contract with an existing supplier
This Suffolk based transport company were running out of warehousing space due to a growing contract.

They opted to hire two temporary warehouse buildings which were linked by an integral gutter system, which has provided them with additional 1500square metres of warehousing space in which to store their clients' products ahead of distribution.
Before ordering, they visited our premises to view our range of display buildings and meet our design and planning team, after which, they instructed us to handle the entire planning permission process on their behalf.
This particular planning permission application took 19 weeks from initial application to formal approval, and was handled entirely by Ross, on their behalf.

17.5m wide x 50m long x 4.4m side-height linked to 12.5mtr x 50mtr long x 4.4m side-height
Grey fabric ‘thermo-insulated’ roof with goose wing grey steel walls with 38mm insulation
Have a space in mind?
Send us the details and we’ll talk you through the options.
Tell us about itReal Projects
Smart-Space delivered a tailored building to power hib's manufacturing.
Following a fire, Smart-Space provided rapid, tailored storage for IBMG.
Fast-installed temporary building created vital space for Central Mailing Services.
Arken Pop was facing an upturn in business and urgent demand for extra storage.
As their product range and stock levels increased, BJ Toys required a fast and efficient way to add more storage.
Dedicated valeting bay to support daily dealership operations.
A chemical manufacturer needed a temporary building to protect a key piece of equipment from the elements.
To reduce transport and handling costs, this company required extra storage space on site.
Smart-Space engineered a shortened bay structure to fit perfectly between two existing buildings.
Boost to school sports capacity
After losing a warehouse to fire, the company required a temporary building installed quickly.
Situated in a green belt area, the project required a building that would complement the landscape.