Smart-Space Instant Buildings
Magnus temporary warehouse

Magnus temporary warehouse

Smart-Space supplies additional temporary warehouse to a Suffolk Transport company to meet the needs of a growing contract with an existing supplier

check_circle 1,500 m² extra warehouse space
check_circle 38 mm insulated steel walls

On-site Temporary Warehouse Building

This Suffolk based transport company were running out of warehousing space due to a growing contract.

Supplied with integral connecting
PVC gutter system

They opted to hire two temporary warehouse buildings which were linked by an integral gutter system, which has provided them with additional 1500square metres of warehousing space in which to store their clients' products ahead of distribution.

Before ordering, they visited our premises to view our range of display buildings and meet our design and planning team, after which, they instructed us to handle the entire planning permission process on their behalf.

This particular planning permission application took 19 weeks from initial application to formal approval, and was handled entirely by Ross, on their behalf.

Overall internal space of 15000sq
with 4mtr x 5mtr roller door fitted
to each building

Size:

17.5m wide x 50m long x 4.4m side-height linked to 12.5mtr x 50mtr long x 4.4m side-height

Specification:

Grey fabric ‘thermo-insulated’ roof with goose wing grey steel walls with 38mm insulation

Have a space in mind?

Send us the details and we’ll talk you through the options.

Tell us about it

Real Projects

Related projects

See all projects
hib

On-site space that scaled efficiently.

View project arrow_forward
Independent Builders Merchants Group

Restoring Operations: Emergency building on-site in 4 days

View project arrow_forward
Central Mailing Services

Tailored space with no operational impact.

View project arrow_forward
Arken Pop - tparc

Rapid Warehouse Space for a Growing Business

View project arrow_forward
B J Toys 20*20 - tpbj

Temporary Storage Solutions to Support Business Growth

View project arrow_forward
Caffyns Ford Valeting Bay - tpcaf

Extra Valeting Capacity When It Was Needed

View project arrow_forward
Chemical Processing Building

Protecting a Critical Manufacturing Process

View project arrow_forward
Contract Bottling - tpcb

Bringing Storage Back On-Site

View project arrow_forward
Custom Temporary Bridge - Euro Car Parts - tpeur

Making the Most of Every Available Space

View project arrow_forward
Deepings School

New school hall and sports facilities at Deepings School

View project arrow_forward
Emergency Buildings - tpem

A Rapid Response to a Warehouse Fire

View project arrow_forward
Environmentally Friendly Building - tpgb

Extra Space Without Impacting the Environment

View project arrow_forward