Smart-Space Instant Buildings
Pret-a-Manger temporary coffee lounge

Pret-a-Manger temporary coffee lounge

Pret-a-Manger needed a temporary coffee lounge during a store re-fit. We provided this one to keep them fully trading during the re-fit

check_circle 500kg/m² floor for soft ground
check_circle Insulated roof prevents condensation

If you happen to be one of the thousands of visitors to The Bicester Retail Outlet, you could have seen the versatility of our re-locatable temporary buildings.

Because, due to a re-fit within their store, Pret-A-Manger hired a 20mtr x 7.5mtr thermo-insulated building as a temporary coffee lounge whilst their store re-fit takes place.

Supplied with lower than normal wall height of 2.4mtr, the building was also supplied with our 500kg m2 weight loading floor because the building is installed on a grassed and mulched area.

Double glazed windows were fitted to the two 20mtr elevations to help with natural daylight, and the roof covers are thermo-insulated to eliminate condensation.

The building measures 20mtr x 7.5mtr x 2.4mtr

Have a space in mind?

Send us the details and we’ll talk you through the options.

Tell us about it

Real Projects

Related projects

See all projects
hib

On-site space that scaled efficiently.

View project arrow_forward
Independent Builders Merchants Group

Restoring Operations: Emergency building on-site in 4 days

View project arrow_forward
Central Mailing Services

Tailored space with no operational impact.

View project arrow_forward
Arken Pop - tparc

Rapid Warehouse Space for a Growing Business

View project arrow_forward
B J Toys 20*20 - tpbj

Temporary Storage Solutions to Support Business Growth

View project arrow_forward
Caffyns Ford Valeting Bay - tpcaf

Extra Valeting Capacity When It Was Needed

View project arrow_forward
Chemical Processing Building

Protecting a Critical Manufacturing Process

View project arrow_forward
Contract Bottling - tpcb

Bringing Storage Back On-Site

View project arrow_forward
Custom Temporary Bridge - Euro Car Parts - tpeur

Making the Most of Every Available Space

View project arrow_forward
Deepings School

New school hall and sports facilities at Deepings School

View project arrow_forward
Emergency Buildings - tpem

A Rapid Response to a Warehouse Fire

View project arrow_forward
Environmentally Friendly Building - tpgb

Extra Space Without Impacting the Environment

View project arrow_forward