Smart-Space Instant Buildings
Emergency temporary buildings

Emergency temporary buildings

FAST installs of storage, warehouse, and all other types of building when you have an urgent need

2016-02-22 10:58:00 2021-01-05 03:29:34
Our temporary buildings can be installed FAST from stock by out own installation teams

If you’re unfortunate enough to need a temporary building in an emergency, at least you can relax knowing we’re here to help as quickly and efficiently as you’d like.

  • Ideal as an 'instant' temporary fix
  • No footings or foundations required
  • Can be secured to literally any ground surface (using either bolts or spikes)
  • No ground preparation needed ahead of installation
  • Can be extended or reduced in size, quickly and easily if your needs change
  • Fast to erect and fast to dismantle
  • Will even stand on sloping or uneven ground due to the flexibility of the PVC roof system

Testimonials

Cost Considerations

The temporary buildings generally cost less than the Interim and Steel buildings.

Advantages when buying:

  • Less costly to install as there are no working at height considerations (No need for scaffold and edge protection, or for operatives to work on top of the roof)
  • Can be re-located from site to site to site as often as needed
  • Retain good re-sale values should you ever wish to sell.
  • Very rarely if ever charged rates as it's classed as transient

Advantages when hiring:

  • No capital outlay ahead of installation
  • Can be installed in just 7 – 21 days from order (from us)
  • Only 7 days’ notice required to terminate (from us) should your plans change
  • No maintenance costs when hiring as it's the responsibility of the company who supply it.
  • Can be hired for as little or long as you need on flexible terms (from us)
  • Tax deductible as plant hire to reduce profits and corporation tax.
  • No additional base/groundwork costs if it's to be erected on existing ground – dependent upon the surface available to you.
The following considerations need to be borne in mind: 

Whether Hiring or Buying:

  • They depreciate and deteriorate over time
  • Borrowing from asset finance companies can be tricky due to the portability.
  • PVC roof covers deteriorate over time and should be replaced every 10 years
  • Potential for on-going maintenance issues through impact and weather damage. / costs (Electric roof inflation pumps)
  • Very costly to heat and cool due to the lack of insulation of the PVC fabric roof.

Building Options

The following options are available on this building

  • Heavy structural floor
  • Integral floor
  • Non-insulated roof
  • Thermo-insulated roof
  • 38mm insulated sandwich panel
  • PVC fabric walls for blast zone use
  • 0.7mm steel wall
  • Forklift truck access curtains
  • Pedestrian access door
  • Manual roller door
  • Electric roller door
  • Double glazed window panels
  • 6ft twin tube fluorescent lights
  • 400w sodium spotlights
  • Internal partitions
  • Internal office doors
icon icon icon icon

Please call us on

For Free Advice