1. Home
  2. Our Work
  3. Featured Installations

Featured case studies

Here we list an interesting sample of the work we have done
2016-02-19 00:16:00 2019-09-27 12:01:36

Temporary storage building for the Woodland Group

Smart-Space temporary storage building takes significant pressure off Woodland Group operation

Temporary building for airport reception areas

Smart-Space assists Leeds Bradford Airport to manage the safety of staff, contractors, visitors and passengers during these extraordinary times

Workshop building for CoTech in Bedford

It is expected that the whole building project would pay for itself after six months.

Temporary storage building for food producer

“We were looking for a quick and effective method of boosting production by reorganising the space allocated to packaging and Smart-Space provided us with the ideal solution”

A third Smart-Space instant building for Rapiscan

We did our preparation, talked to Smart-Space, and got exactly what we wanted

Relocatable Building for Stratford Padel Club

Stratford Padel Club is situated right by the Olympic Stadium in East London - the temporary building is on a busy main road and attracts a lot of attention.

Additional storage for Quartzelec in Rugby

Intelligent storage solution saves costs at Quartzelec

Temporary store for watch company

Smart-Space has designed and built a Temporary Storage Building for a Watch Company based In Milton Keynes.

Vehicle showroom for FG Barnes

New vehicle showroom for FG Barnes at the automotive retailer's multipark in Parkwood, Maidstone

Production facility for bolt building supplies

Bolt Building Supplies bring design and production of I-beams on-site

Portable Venues (Group) Ltd

ajax loading

Download our Free Buildings Guides

Any questions you may have

Customer Satisfaction Survey

Feedback from our clients on our customer service
4.6
4.6
from 170 Reviews
back-to-top

Please call us on

For Free Advice