Temporary building installed for Leeds Bradford airport

Airport introduces additional measures during pandemic
“The team’s positivity and can-do attitude was so refreshing””
2020-07-29 10:15:00 2021-03-18 15:55:29
temporary-air-terminal-building-LEE006-3-1 Passenger reception area

The guys worked through a number of challenging conditions professionally and efficiently, without complaint.

They moved from one job to the next efficiently and proactively and completed ahead of time.


Tony Hiorns, Engineering Director
Leeds Bradford Airport

Temporary building installed for Leeds Bradford airport
ajax loading

See the full Leeds Bradford Airport case study here.