1. Home
  2. Our Work
  3. Permanent Steel Buildings

Permanent Steel Building Case Studies

2016-02-19 00:20:00 2018-04-30 04:15:29

Workshop building for CoTech

It is expected that the whole building project would pay for itself after six months.

Production Facility For Bolt Building Supplies

Bolt Building Supplies bring design and production of I-beams on-site

Coundon Court School Sports Hall

Smart-Space completes a full design and build of a four-court sports hall for Coundon Court

Production and Storage Facility for Fast-Expanding Commercial Lighting Specialist

Luxonic Lighting needed to expand and improve their production facility

Supplementary Storage For Kitchen Manufacturer

Sigma 3 sought to improve efficiencies by bringing the stock into one location and closer to the main building so that it could be fed directly into the cutting machines.

Fast Track Building System Boosts Production Space

Fast Track Building Extension Adds Manufacturing Space for Healthcare Company to Continue 300 Year Growth Trajectory

New Sixth Form Block For Kingsbury School Comprising of 3 Classrooms

New Sixth Form Block For Kingsbury School Comprising of 3 Classrooms provides a much better solution than could ever be achieved with huts

Rapid Build Loading Bay Solves Warehouse Space Dilemma

Gearing Up for Growth – New Rapid Build Loading Bay Facilities Help Mitchell Powersystems Solve the Warehouse Space Dilemma.

SB Rail Permanent Steel Workshop

A traditional building was going to take too long to construct So SB Rail contacted us for a faster solution. Here is the Locomotive Workshop Building we provided.

Kingsbury School Sports Hall

Sports Hall Building At Kingsbury School. They approached us for a temporary building. But after viewing structures at our display site they opted for this Permanent Steel Building.

Dovehouse Motors Workshop

We provided a turnkey solution for this project building. The steel car workshop buildings design, approval, delivery and installation was handled in house by us from start to finish. As always.

Steel Warehouse Purchase For Sensitive Material Storage

This company purchased a permanent steel warehouse from us as the most cost effective means of meeting their requirements.

UYS Loading Bay

Smart-Space supplies bespoke steel canopy loading bay to motor parts supplier. They were thinking of a temporary canopy, but this more robust solution worked out cheaper in the long-term.

Kia Motors New Dealership Car Showroom

When Kia opened a new showroom in Glasgow, they wanted a cost-effective means of creating a showroom area, without the expense of a traditional building.

Motor Repair Workshop

This motor dealership has now got a building which not only looks the part, but they've got one which meets all the latest building regulations.

New Workshop For Tyre Centre

We provided this new build Permanent Steel Building to be used as a Tyre Workshop for a Leicester Tyre Specialist

Steel-clad Permanent Building in Dungeness

It doesn't get more exposed than this. So we agreed to supply a brand new 15mtr x 20mtr steel clad building with 40mm insulated roof and 40mm insulated wall cladding to cope with environmental extremes

Hughes Mercedes Smart Repair

This high class dealership needed a building that reflected their brand. We gave them an 8m x 7m 2 bay valeting bay with skylights and anti-condensation roof.

Production Clean Room

A building within a Building. Environcom needed a clean-room area within their existing factory for sensitive electronic equipment production.

Car Dealership Showroom For Richmond Cars Portsmouth

This permanent steel car dealership showroom is one of three buildings Smart-Space supplies to the Richmond Cars Group - Europe's No 1 Hyundai Dealer.

PJ Lintern Tyre Bay

P J Lintern expands their workshop space with an additional purpose built tyre bay. This would then free enough room in their existing workshop to install an extra ramp, increasing the productivity in their existing building.

Factory Extension Building - Fast Permanent Building Installation

Shimizu wanted to extend their existing factory building - this is how we gave them a permanent steel building extension in just 56 days from first call.

Bespoke Steel Buildings for Production - Manufacturing

This company took advantage of the benefits of having natural lighting and the added insulation of a Hybrid steel building.

Steel Pipeline Production Building for Manufacturing Company

If every minute is vital, and you can’t halt production for a moment, how do you go about having a new building built, whilst your production continues?

Portable Venues (Group) Ltd

ajax loading

Any questions you may have

back-to-top

Please call us on

For Free Advice