header-bg
  1. Home
  2. Our Work
  3. Featured Installations
  4. Industrial
Manufacturing buildings and industrial building studies

Manufacturing buildings and industrial building studies

2016-02-22 14:29:00 2021-02-26 21:08:47

Production clean room

A building within a Building. Environcom needed a clean-room area within their existing factory for sensitive electronic equipment production.

Factory extension building - fast permanent building installation

Shimizu wanted to extend their existing factory building - this is how we gave them a permanent steel building extension in just 56 days from first call.

Bespoke steel buildings for production - manufacturing

This company took advantage of the benefits of having natural lighting and the added insulation of a permanent steel building.

Steel pipeline production building for manufacturing company

If every minute is vital, and you can’t halt production for a moment, how do you go about having a new building built, whilst your production continues?

Portable Venues (Group) Ltd

ajax loading
back-to-top
back-to-top

Please call us on

For Free Advice